Summary

The No.1 choice of Keralites across the globe, Skyline Builders, offer a new landmark in luxury living at Elamakkara in Kochi, the Skyline Amber. With easy access to all essential facilities like schools, shopping malls, supermarkets, public transportation, hospitals, and Edappally metro rail station the Amber is perfect for those in the search of luxury living at its finest. Housing meticulously designed 3BHK units ranging between 1671 Sq.Ft & 2027 Sq.Ft (Building Permit Number EYP2/COC/EYP/0890/13), this luxury apartment project is set amidst an area of 1.75 acres. The Amber is located adjacent to Skyline Jade and features a host of world-class amenities and features to ensure a wholesome lifestyle for you and your family.  

Quick Facts

Elamakkara , Kochi
Luxury Apartments
1671 Sq.ft to 2027 Sq.ft
148 Apartments of 3BHK
BP Number - EYP2/COC/EYP/0890/13

Location Info

Punnackal Temple
0.2 km
Puthukkalavattom Temple
0.4 KM
Lourdematha Church
0.9 KM
Bhavans School
0.6 KM
Deshabhimani Jn.
3.5 KM
St.Antony's Church
3.8 KM

Specifications

Doors and windows
Elegant fully panelled polished teak wood entrance door. Flush doors for bedrooms. Partially glazed Elegant fully panelled polished teak wood entrance door. Flush doors for bedrooms. Partially glazed flush door for kitchen. Flush door with water resistant coating inside for toilets. Fully glazed sliding door for living balcony. Powder coated aluminium windows. more...
Generator
Generator backup for common facilities such as lifts, common lighting, pumps etc. Generator backup f Generator backup for common facilities such as lifts, common lighting, pumps etc. Generator backup for light, fan and 6A in all rooms, entrance light point, bell push, and TV points, one number 6A socket above counter in kitchen and a 16 A socket for fridge with a limited load of 500 W. The total load limited to 1500 w inside apartment. more...
Electrical
Concealed conduit wiring with copper conductor, adequate light and fan points, 6/16amps socket point Concealed conduit wiring with copper conductor, adequate light and fan points, 6/16amps socket points etc. controlled by ELCB and MCBs with independent KSEB meters. Provision for fixing split AC in all bedrooms and living dining area. more...
TOilet
Toilet walls with high quality ceramic tiles/equivalent upto false ceiling. Granite/equivalent count Toilet walls with high quality ceramic tiles/equivalent upto false ceiling. Granite/equivalent counters for toilet wash basins except in servants toilet. Premium quality CP fittings. Single lever divertor with shower in all toilets except servants toilet. Single lever basin mixers for wash basins in all toilets except servants toilet. Superior quality wall hung sanitary fixtures (Roca or equivalent) with concealed cistern (Gebrit or equivalent) in all toilets except servants toilet. Ordinary EWC in servants toilet. more...
KITCHEN
Kitchen counter with granite top and double bowl single drain sink. Ceramic tile above counter to a Kitchen counter with granite top and double bowl single drain sink. Ceramic tile above counter to a height of 60cms. Hot water provision for kitchen sink. Dish washer and washing machine provision in kitchen/work area more...
Flooring
Mix of Laminated wooden flooring and 80cms x 80cms vitrified tile for living and dining area. Vitrif Mix of Laminated wooden flooring and 80cms x 80cms vitrified tile for living and dining area. Vitrified tiles 80 x 80 cms for bedrooms and all balconies. Vitrified tiles 60 x60 cms for kitchen and utility. Superior quality Ceramic tiles/equivalent for toilets. more...
Lifts
Two fully automatic lifts (one passenger lift and one bed lift) in each block. Two fully automatic lifts (one passenger lift and one bed lift) in each block.
TV Point
TV point in living room and all bedrooms. TV point in living room and all bedrooms.
Fire Fighting
Fire fighting arrangements as per NBC norms. Fire fighting arrangements as per NBC norms.
Painting
Putty and Plastic emulsion for internal walls and ceiling Putty and Plastic emulsion for internal walls and ceiling

Progress

Work in progress as on  26th December 2019

    • Main Floor Tiling works completed till 19th Floor
    • Toilet Tiling works progressing in 16th Floor
    • Plumbing/Aluminum Joinery works/Fabrication Works progressing
    • False Ceiling Works progressing
    • External Painting Progressing
Common Area
  • Ramp Works : Handrail fixing completed
  • Yard Tiling: North side completed, Progressing in West side
  • Gas Bank Room : Block Work & Plastering Completed , 1st Coat Painting completed
  • Ground Floor Car Park area tiling progressing
  • Compound Wall Painting work progressing

Progress Images

Download Ebrochure

Projects Approved by Banks
Why Invest in 24 Carat?
We have an unwavering commitment to building.We are both knowledgeable and passionate about every aspect of what we do and we do all we can to communicate that knowledge and passion to homebuyers.Read More