Summary
City Light
A tribute to the legacy and glory of the city - Skyline crafts its 155th project Skyline City Light at East Fort, Thrissur. A project offering 2, 3 and 4 BHK options, embellished with aesthetic luxury and world class amenities, City Light welcomes you to a premium cove amidst urban leisure.
With the hues of tradition and elegance, Thrissur is named as the cultural capital of the state. Located at East Fort, one of the liveliest locales in Thrissur, Skyline City Light offers you a dynamic neighbourhood along with close proximity to social conveniences. The project is ideally located next to shopping malls, hospitals, churches and schools.
With a design that gives equal importance to quality and aesthetics, City Light stands out as a grandeur. From the pool deck party area to the fitness centre and children’s play area, each amenity is carefully crafted to ensure your comfort.
Amenities

Swimming pool with kid's pool

Driver's room

Pool Deck Party Area

Children’s Play Area

Caretaker Room / Fire Control Room

Guest Parking Area

Air conditioned multi-purpose recreation hall

Fitness centre - Equipped with modern fitness equipments

Biometric access control to lobbies in both basements and ground floor

Location
and Reach
1 KMJubilee Mission Medical College
600 MOur Lady of Lourdes Metropolitan Cathedral
400 MNirmala Matha Central School
550 MEbenezer Mar Thoma Church
750 MShopping Mall
1 KMSt. Thomas College
600 MEast Fort Junction
1.6 KMSwaraj Round

PROJECT
SPECIFICATIONS
Loading specifications...

Floor Plans
Progress Images
Loading progress images...
Ongoing
- Internal plastering, Electrical chasing ,Plumbing concealed work, completed .
- Toilet tile laying, completed
- External Plastering completed
- Aluminum Window frame fixing, completed
- Main floor tile laying for 29 apartments completed
- Door fixing ,9th & 10th floor A&B completed, 11C & D completed.
- Window grill fixing- 13th floor work in progress
- Typical lobby tile laying 4th to 11th floor completed
- Main stair, tile laying completed
- First coat painting for apartments in progress
- Fire stair tile laying completed from 4th to 15th floor.
- Main entrance gate ,structural work completed
- External primer work in progress
- Lift cladding for passenger lift in progress
Let's Connect
Fill out the form below and our team will contact you shortly.
Looking for More Projects At Thrissur?
Loading projects...








+91 97444 03333
+971 554 552 975








