Summary
Hilltop
Classy living with luxurious amenities. Skyline Hilltop has class written all over. The 2&3 BHK apartments are functionally laid out to provide you utmost privacy and living comfort. The spacious kitchen and living-dining with lavish balcony spaces make the spaces elegant. Nearby all the urban conveniences like good eateries, worship places of all creeds, fuel station and public transport. Pretty close to Edappally and Lulu Mall, the location provides you easy accessibility to Aster Medcity, Amrita Institute of Medical Sciences, Metro Station and NH 47.
Amenities

Kids' Play Area

Outdoor Yoga

Swimming pool with kid's pool

AC fitness centre

Air Conditioned Association Room

Ground Floor Lounge

Air conditioned multipurpose recreation room.

Indoor Games Room

Half Basket Ball Court Cum Pickle Ball

Tree Court

Biometric access control at ground floor entry and basement entry

Location
and Reach
1.8kmAmrita Vidyalayam
3.1kmAl-Ameen Public School
3.2kmAmritha School of Medical Sciences
5.3kmSt. Ann's Public School
1.4kmKunnumpuram Govt High School
1.6kmSt. Joseph's (Manjummel) Hospital
2.9kmAmrita Hospital
5.3kmAster Medcity
5.7kmRenai Medicity
4.7kmLulu International
4.9kmGrand Mall
5.1kmOberon Mall
350mFathima Matha Church
350mSree Bhuvaneswari Temple
1.2kmNH 66
1.8kmAmalolbhava Matha Church
1.6kmShrikrishna Swami Temple
2.9kmCheranellur Juma Masjid
3.2kmCentral Juma Masjid
3.2kmEdapally Juma Masjid
3.4kmSBI, Udyogamandal
3.5 KMRajagiri Public School

PROJECT
SPECIFICATIONS
Loading specifications...

Floor Plans
Progress Images
Loading progress images...
STATUS UPDATE 23/02/2026
- Pile chipping 78%
- Concrete for pile cap 85%
- Concrete for Grade beam & Basement slab 86%
- Basement floor Column- Main building 100%
- GF slab & beam casting -Main building 100%
- GF column work 100%
Slab work
- -1st-9th floor slab 100%
- -10th floor slab 40%
Column work
- -1st-7th floor columns 100%
- -8th floor column 100%
- -9th floor column 70%
Ceiling Plastering
- -1st-4th floor 100%
- -5th floor 100%
- -6th floor 90%
Masonry
- -1st floor - 90%
- -2nd floor - 100%
- -3rd floor 80%
- -4th floor 80%
- -5th floor 20%
Plastering
- -1st floor - 20%
- -2nd floor - 50%
Electrical chasing
- -1st floor 50%
- -2nd floor 80%
Sample Flat
- -Block work 100%
- -Plastering 100%
- -Putty 90%
- Main flooring 80%
- Sump tank excavation 100%
- Fire pump room excavation 100%
- Ramp area works basement 75%