Summary

Skyline Synergy is the luxury apartment project situated in Cheranallor one of the most sought after locations in Cochin. These flats near Lulu Mall, provides numerous facilities to its residents. The 18-floor luxury apartment project, Skyline Synergy, is designed to have 141 apartment units of 2 and 3 BHK ranging from 1135 sq.ft. to 1737 sq.ft. These flats near Lulu Mall, Kochi are also located close to other shopping complexes, CIMAR Hospital, Amrita Institute of Medical Sciences, Aster Medcity,  NH 66, etc. Spread across 1.51 acres of serene landscape, Skyline Synergy provides ample ventilation to each and every apartment.   

Quick Facts

Cheranalloor,Kochi
Luxury Apartments
1135 sq-ft. to 1737 sq-ft.
141 Apartments of 2&3 BHK
BP Number - C4-6549/13

Location Info

St. James Church
0.4 km
Bagavathy Temple
0.2 km
NH 17
0.75 km
Lulu Mall
4.0 km
Marine Drive
11 km
Cochin International Airport
22 km

Specifications

Doors and windows
Elegant teak wood entrance door. Flush door for bedrooms. Partially glazed flush door for kitchen. F Elegant teak wood entrance door. Flush door for bedrooms. Partially glazed flush door for kitchen. For toilets, flush door with lamination on the toilet side. Fully glazed sliding door for living balcony. Powder coated aluminium windows. more...
Generator
Generator back up for common facilities such as lifts, common lighting, pumps etc. Generator back up Generator back up for common facilities such as lifts, common lighting, pumps etc. Generator back up for light points, fan points, TV points, 6 A in all rooms except kitchen, on 6 A above kitchen counter, one 16 A for fridge with a load limit of 500 W. The total load limited to 1250 W in the apartment. more...
Electrical
Concealed conduit wiring with copper conductor, adequate light and fan points, 6/16 amps socket poin Concealed conduit wiring with copper conductor, adequate light and fan points, 6/16 amps socket points etc. controlled by ELCB and MCBs with independent KSEB meters. more...
TOilet
Toilet wall with ceramic tile up to false ceiling. Premium quality CP fittings. Single lever diverto Toilet wall with ceramic tile up to false ceiling. Premium quality CP fittings. Single lever divertors with shower in all toilets. Single lever basin mixer for master bed toilet wash basin. Wall hung sanitary fixtures with concealed cistern in all toilets. more...
KITCHEN
Kitchen counter with plished granite slab and single bowl single drain sink. Ceramic tile above coun Kitchen counter with plished granite slab and single bowl single drain sink. Ceramic tile above counter to a height of 60cms. Hot water provision for kitchen sink. more...
Flooring
Vitrified tiles 60 x 60 cm for entire apartment except toilets. Ceramic tiles for toilets. Vitrified tiles 60 x 60 cm for entire apartment except toilets. Ceramic tiles for toilets.
Lifts
Three fully automatic lifts. (Two passenger lift and one bed lift) in each block. Three fully automatic lifts. (Two passenger lift and one bed lift) in each block.
Telephone
Telephone point in living room and master bedroom. Telephone point in living room and master bedroom.
TV Point
TV point in living room and master bedroom. TV point in living room and master bedroom.
Fire Fighting
Fire fighting arrangements as per NBC norms. Fire fighting arrangements as per NBC norms.
Painting
Putty and plastic emulsion for internal walls and ceiling. Putty and plastic emulsion for internal walls and ceiling.

Progress

Work in progress as on 7th June 2019
  • Flooring works (main floor / toilet dado, toilet floor) : A Block : 11th floor completed. B Block : 10th floor completed.
  • Main Door shutter fixing - 8th floor completed.
  • Wire pulling - 11th floor completed.
  • Switch fixing : Tower A : 4th floor completed. Tower B : Work started.
  • Yard : 50% ramp work completed.
  • Main gate : Foundation work completed.
  • Swimming Pool : structure work completed.
  • Basement & ground floor carparking area nearing completion
Tower A (A, B, C, D apartments)
  • Ground Floor RCC completed
  • First Floor Block work , door frame and electrical chasing completed
  • Second Floor Tile work work completed except A apt and aluminum frame fixing work completed , gratings work completed , pointing work completed and false ceiling work completed
  • Third Floor Toilet dado & flooring and counter frame work completed, 2 coat putty work completed, false ceiling work and flooring work is in progress
  • Fourth Floor Toilet dado and counter frame work completed , plumbing , waterproofing, fire work, 2 coat putty work completed
  • Fifth Floor Toilet dado work , counter frame, plumbing , waterproofing, fire work, 2 coat putty work completed
  • Sixth Floor Plumbing, waterproofing , fire work, counter frame, 2 coat putty work completed
  • Seventh Floor Counter frame work, Plumbing concealed and suspended work , fire work , waterproofing work, 2 coat putty work completed.
  • Eighth Floor Counter frame, plumbing concealed work ,fire work , waterproofing work , plumbing suspended work completed
  • Ninth Floor Plumbing work ,fire work completed & waterproofing work , counter frame work completed
  • Tenth Floor Plumbing work ,fire work , waterproofing work , counter frame work completed
  • Eleventh Floor Internal plastering work , plumbing work , fire work ,waterproofing completed & counter frame work is in progress
  • Twelveth  floor Internal plastering, plumbing concealed work ,fire work completed
  • Thirteenth Floor Internal plastering, plumbing work and waterproofing completed
  • Fourteenth Floor Internal plastering & plumbing work completed
  • Fifteenth floor Internal plastering & electrical work completed
  • Sixteenth floor Block work, electrical chasing, internal plastering work , and plumbing work completed
  • Seventeenth Floor Block work electrical work completed and internal plastering work completed
  • Eighteenth Floor Ceiling plastering ,block work , electrical work & internal plastering work completed
  • Nineteenth Floor parapet wall casting , water tank , ornamental works, machine room plastering completed and tank outside plastering is in progress
  • Terrace Floor Machine room floor slab completed
Tower B (E, F, G, H apartments)
  • Ground Floor RCC completed
  • First Floor Block work and electrical work completed, internal plastering completed
  • Second Floor Tile work completed, false ceiling work completed
  • Third Floor Toilet dado, flooring, plumbing, waterproofing, external plastering,, counter frame, False ceiling work completed, tile flooring work completed except balcony.
  • Fourth Floor Toilet dado work, concealed plumbing work in toilets and suspended work, fire work, waterproofing, tile flooring work and false ceiling work completed
  • Fifth Floor Toilet dado, external plastering, Plumbing suspended work in toilet, waterproofing ,counter frame, putty & flooring work completed and false ceiling work is in progress
  • Sixth Floor Plumbing concealed and suspended work, external plastering , fire work, water proofing , counter frame fixing and toilet dado tile work completed
  • Seventh Floor Plumbing and suspended work, fire work, waterproofing , counter frame completed and toilet dado work is in progress
  • Eighth Floor Plumbing work , waterproofing , fire work, suspended work , counter frame completed , false ceiling work is in progress
  • Ninth Floor Plumbing concealed and fire work work completed and waterproofing work completed and suspended work completed and counter frame completed
  • Tenth Floor Plumbing work, waterproofing , fire work, counter frame work completed
  • Eleventh Floor Internal plastering , plumbing concealed work , fire work , plumbing work , waterproofing work completed
  • Twelveth  floor Internal plastering , water proofing , fire work, plumbing work ,counter frame completed
  • Thirteenth Floor Internal plastering work , water proofing ,fire work and plumbing work completed
  • Fourteenth Floor waterproofing & electrical chasing ,internal plastering and plumbing work completed
  • Fifteenth floor Internal plastering , plumbing concealed & suspended work completed
  • Sixteenth floor Block work , electrical chasing , internal plastering and plumbing work completed
  • Seventeenth Floor Ceiling plastering & block work completed and electrical work completed and internal plastering work completed
  • Eighteenth Floor Ceiling work, block work & electrical work and internal plastering completed
  • Nineteenth Floor column casting, parapet wall casted and LMR casting , ornamental works completed and deshuttering work is in progress
  • Terrace Floor Shuttering and steel work in progress

Progress Images

Download Ebrochure

Projects Approved by Banks
Skyline Synergy Cheranalloor, Kochi, Ernakulam, Kerala - 682034Phone: +9104842363695 Working hours 9:00 AM to 6:00 PM
Why Invest in Synergy?
Skyline Synergy is located in the new heart of Cochin, Cheranaloor. The rapidly developing Cheranalloor provides a numerous facilities for residential purpose. It is the new hot spot of Cochin with numerous commercial, health and educational centres.Read More