Skyline Windmill at Thiruvalla
Ongoing Luxury Apartments in Manjadi, Thiruvalla
Project in major Cities
RERA NO: K-RERA/PRJ/170/2020
rera.kerala.gov.in
Summary
Welcome to our luxury apartment project, Skyline Windmill (Building Permit Number BP. 201/18-19). Located at a fast developing neighbourhood of Manjadi, Thiruvalla, this residential luxury apartment project is close to all modern convenience.
Skyline Windmill has 84 spacious apartments with a configuration of 2 and 3 BHK ranging from 1209 sq.ft to 2234 sq.ft(carpet area: 852 sq.ft -1538 sq.ft). The intelligent design of this project provides maximum natural light and ventilation. This luxuriously laid out B+G+18 floor high-rise apartment comprises of a host of luxurious amenities. This project offers an ideal locale in the heart of town with a serene ambience.
Quick Facts
Manjadi, Thiruvalla
Luxury Apartment
1209 sq.ft - 2234 sq.ft (carpet area: 852 sq.ft -1538 sq.ft)
2 & 3 BHK Apartments
BP Number - BP.201/18-19
RERA NO: K-RERA/PRJ/170/2020
Location Info
Manjadi Junction
100M
KSRTC Bus Stand
1KM
Railway Station
1.2KM
Pushpagri Hospital
500M
Bank
500M
Believers Hospital
4KM
Amenities
Specifications
Doors and windows
Hard wood frame with elegant designed flush door for entrance.
Hard wood frame with Flush door for all internal doors.
Fully glazed Aluminum sliding door for living balcony.
Powder coated aluminum windows.
more...
Generator
Generator back up for common facilities such as lifts common lighting, pumps etc.
Generator back up for
Light and fan in all rooms, entrance light point, bell push, TV point.
6A point near telephone point in living room.
6A point for water purifier in kitchen,
16A of fridge point with a load of 500W
Total Generator back up limited to 1250 W in the apartment.
more...
Electrical
Concealed conduit wiring with copper conductor
Adequate light and fan points
6/16amps socket points etc controlled by ELCB and MCBs with independent KSEB meters.
Geyser point and exhaust fans points in all bathrooms and kitchen.
more...
TOilet
Premium quality floor tiles and wall tiles up to ceiling.
Premium quality bath fittings.
Single lever Divertor with shower in all toilets.
Single lever basin mixer for master bed toilet wash basin.
Wall hung sanitary fixtures with concealed cistern in all toilets except Servant Toilet
Wall mounted EWC in Servants Toilet
more...
Kitchen & Utility
Adequate power points for home appliances.
Polished granite slab for kitchen counter.
Ceramic tile above counter to a height of 60cms.
Hot water provision for kitchen sink.
Stainless steel sink with drain board of premium brand
Electrical/plumbing for water purifier /washing machine/dish washer.
more...
Flooring
Vitrified tiles for bedrooms, kitchen, living area, dinning.
Ceramic tiles for toilets.
Lifts
Three fully automatic modern lifts (Two passenger lift and one bed lift) with ARD.
Telephone / Video Door Phone
Telephone point in living room.
TV Point/Internet Point
TV point in living room and master bedroom
Painting
External walls-2coats premium emulsion and texture finish as per architect design.
Internal walls & ceiling-2 coats premium emulsion over two coats putty finish.
more...
Ac Point
Provision for keeping Split AC in all Bedrooms and Living Area
Progress
Work in progress as on 11/01/2022
- Terrac,e floor slab casting 50% completed.
- Terrace floor slab shuttering work 90% completed .
- Terrace floor slab steel work 70% completed .
- 18th floor slab casting completed.
- 15th floor block work completed.
- 16th floor block work in progress.
- 15th floor ceiling plastering work completed.
- 16th floor ceiling plastering in progress.
- Door frame work in 12th floor completed.
- Door frame work in 13th & 14th floor in progress.
- 9th , 10th & 11th floor internal plastering work completed.
- 12th & 13th floor internal plastering work in progress.
- External plastering elevation A & B type work completed upto 10th floor.
- Fire fighting work in 3rd, 4th, 5th & 6th floor completed.
- Fire fighting work in 7th & 8th floor in progress.
- Water proofing in 3rd, 4th & 5th floor completed.
- Water proofing in 6th floor in progress.
- STP tank water proofing work in progress.
- Core cutting upto 11th floor completed.
- Putty work in 3rd & 4th floor in progress.
- Flooring work in 1st , 2nd & 3rd floor in progress.
- Dado tile work in 1st , 2nd & 3rd floor in progress.
- Plumbing work in 6th floor completed.
- Plumbing work in 7th in progress.
- Electrical chasing in 12th floor completed.
- Electrical chasing in 13th floor in progress.